
Lochsa Engineering provided construction documents for this six story, steel framed building. This 8,7500 SF project utilizes a braced frame lateral elevator/stair core in place of the conventional concrete core for an economical design.
Completed: 2007
Services: Structural
Boise Office
201 N. Maple Grove Rd.
Suite 100
Boise, ID 83704
Las Vegas Office
6345 S. Jones Blvd.
Suite 100
Las Vegas, NV 89119
© 2020 Lochsa Engineering